Merge pull request #137 from stefanv/update-pre-commit #329
tests.yaml
on: push
pre-commit
23s
docs
28s
Matrix: tests
Annotations
4 errors
|
pre-commit
Process completed with exit code 1.
|
|
tests (3.10)
Process completed with exit code 1.
|
|
tests (3.x)
The strategy configuration was canceled because "tests._3_10" failed
|
|
tests (3.x)
The operation was canceled.
|