Skip to content

fix(docs): backport PR #22419 — update networks page for Alpha phase, fix contract addresses and unstaking delay#22424

Merged
critesjosh merged 2 commits intobackport-to-v4-next-stagingfrom
claudebox/backport-22419-v4-next
Apr 8, 2026
Merged

fix(docs): backport PR #22419 — update networks page for Alpha phase, fix contract addresses and unstaking delay#22424
critesjosh merged 2 commits intobackport-to-v4-next-stagingfrom
claudebox/backport-22419-v4-next

Conversation

@AztecBot
Copy link
Copy Markdown
Collaborator

@AztecBot AztecBot commented Apr 8, 2026

Summary

Backport of #22419 to v4-next.

The automatic cherry-pick failed due to conflicts in docs/docs/networks.md — the v4-next branch had different Slasher mainnet address (0x91a3745c...) compared to next (0x64E6e9Bb...).

Conflict resolution

Took PR #22419's updated addresses for all conflicting rows:

  • Slasher: mainnet 0x64E6e9Bb..., testnet 0xCF750B72... (was showing Rollup address)
  • Tally Slashing Proposer: mainnet 0xa4a38fD0... (verified via Slasher.PROPOSER)
  • Honk Verifier: added mainnet 0x70aedda4... (was N/A)
  • Slash Payload Cloneable: added mainnet 0xAA43220b... (was N/A)

Also included (applied cleanly)

  • Reward Booster mainnet address update
  • Unstaking delay: replaced conditional with table showing both networks
  • Added governance withdrawal delay info (~38 days mainnet, ~1.6 days testnet)

ClaudeBox log: https://claudebox.work/s/8697787a37a84540?run=1

critesjosh and others added 2 commits April 8, 2026 18:00
Cherry-pick of abdb834
Original PR: #22419

Conflicts in docs/docs/networks.md
Resolved conflict by taking PR #22419's updated addresses:
- Slasher: mainnet 0x64E6e9Bb..., testnet 0xCF750B72...
- Tally Slashing Proposer: mainnet 0xa4a38fD0...
- Honk Verifier: added mainnet 0x70aedda4...
- Slash Payload Cloneable: added mainnet 0xAA43220b...
@AztecBot AztecBot added ci-draft Run CI on draft PRs. claudebox Owned by claudebox. it can push to this PR. labels Apr 8, 2026
@critesjosh critesjosh marked this pull request as ready for review April 8, 2026 18:44
@critesjosh critesjosh enabled auto-merge April 8, 2026 18:44
@critesjosh critesjosh merged commit b747dfd into backport-to-v4-next-staging Apr 8, 2026
23 of 29 checks passed
@critesjosh critesjosh deleted the claudebox/backport-22419-v4-next branch April 8, 2026 18:44
AztecBot added a commit that referenced this pull request Apr 9, 2026
BEGIN_COMMIT_OVERRIDE
feat(e2e): support running tests against legacy noir contract artifacts
(#22388)
chore: deflake p2p client test (#22385)
fix: pass additionalScopes to executeUtility (#22411)
fix(docs): backport PR #22419 — update networks page for Alpha phase,
fix contract addresses and unstaking delay (#22424)
chore: Reduce logging verbosity (#22423)
END_COMMIT_OVERRIDE
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

ci-draft Run CI on draft PRs. claudebox Owned by claudebox. it can push to this PR.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants